PRACTICAL APPLICATION PROJECT

PRACTICAL APPLICATION PROJECT

The primary theme of the paper is PRACTICAL APPLICATION PROJECT in which you are required to emphasize its aspects in detail. The cost of the paper starts from $109 and it has been purchased and rated 4.9 points on the scale of 5 points by the students. To gain deeper insights into the paper and achieve fresh information, kindly contact our support.

REQUIREMENTS:

For the Signed, Sealed, Delivered case study supplied in assignment 1, produce a

professionally formatted document  to include the following:

 

 

       A project plan showing timescales and milestones

 

       A proposed budget

 

       Estimated Project Costs and Benefits

 

       A Project Risk Analysis

 

       A PERT/CPM chart, identifying the project Critical Path

 

 

Submission Requirements

Your report will be presented to your project sponsor in the format of a structured walkthrough of 15 minutes duration.  Each member of your team must participate in the walkthrough and the presentation time should be divided equally between all members.

 

 

You must upload a softcopy of your group report to blackboard and bring a hard copy of your report to the walkthrough so you can ‘walkthrough’ it with your project sponsor (tutor). Please make sure you arrive on time for your allocated walkthrough slot to avoid impacting the running order and other groups.  Failure to do so will involve penalty marks being deducted for lateness.

 

Failure to attend your allocated time slot will result in a mark of ZERO being awarded unless prior arrangements have been made with the tutor

 

Group Assignment- Practical Application Project                                                       1

 

Mark Scheme

 

 

 

Design Document has appropriate content (35 marks)

 

 

       A project plan showing timescales and milestones (10)

 

       A proposed budget (7)

 

       Estimated Project Costs and Benefits (5)

 

       A Project Risk Analysis (6)

 

       A PERT/CPM chart, identifying the project Critical Path (7)

 

Report Layout (5 marks)

 

Report  structure, format, presentation Page Numbers, Titles, Headers, Footers Appropriately referenced Spelling/Grammar clear

 

Walkthrough (10 marks)

 

Content: (5 marks)

Clear Outline of report and  recommendations

Covered report contents

Demonstrated knowledge of material

 

Delivery (5 marks)

Timing under  limit (additional 2-3 minutes question/discussion time) Pitch - Presented to business audience (professional attire and manner)

Quality of vocabulary / professional use of Language

Spoke clearly and confidently / regulated pitch and volume

 

Reflection on   effectiveness of group rules (5 marks)

 

Unauthorised Late  submission deduction (10% per  day)

 

Peer Assessment (20% of final  group mark allocated based on

PA)

 

In order to receive a mark for the assessment, a student MUST attend the walkthrough presentation.  The presentation and team  mark may be reduced if a student does not participate appropriately. The reduction is at

the discretion of the lecturer/tutor.

 

 

Team  Score (40)

 

Final

Walkthrough 10

 

Total 50

 

100% Plagiarism Free & Custom Written
Tailored to your instructions